Animated illustration of a TeraDC campus being built in ten stages, from the substation to five data halls.

Hyperscale platform · Southeast Asia

Built for AI,
Designed for Scale

TERA Data Centers engineers mission-critical campuses that deliver the scale, speed, and reliability demanded by cloud and high-density AI workloads.

Stage 01 / 08
Site
A greenfield plot, surveyed and gridded — every TeraDC build starts here.
2022
Established
Headquartered in Singapore
9+
Campuses
Secured land and power
3
Countries
Across Southeast Asia
>3 GW
Development pipeline
Planned capacity at full build
About us

The ground beneath AI.

T — Track the Shift.
Spot the shift early. Know where the next wave of growth is headed.

E — Expand at Speed.
Move with purpose. Grow through a structured model that can be replicated across markets.

R — Responsible & Resilient by Design.
Create enduring growth by empowering people, supporting stronger communities, and advancing responsible practices that improve how business and society move forward through sustainability, ESG, and meaningful community involvement.

A — Accelerate the Advantage.
Turn every market into an advantage. Capture what works, move faster, and scale smarter in the next.

TERA Data Centers was created for this environment. What exists today is just the first step toward a much bigger future.

Our core strengths

Speed in Delivery

Accelerating time-to-market for hyperscale deployments.

Scalable Campus Solution

Flexible, future-ready infrastructure to meet evolving demands.

Sustainability & ESG Leadership

Committed to green energy and responsible operations.

Locations

A growing footprint across Southeast Asia.

Singapore HQ anchors the platform; live and in-development sites extend it across the region.

Bangkok Kuala Lumpur Johor Singapore (HQ) Jakarta
Sustainability

Efficiency is a design input, not an offset.

Power and cooling are sized together at design time — every facility is built for measured, reported efficiency from day one.

Power feed redundancy
2N
Cooling redundancy
N+1
Cooling design
Low-water
PUE reporting
Per-site
Announcement22 September 2026 · Negeri Sembilan

TERA Data Centers secures 221.665 acres at Eco Business Park 7 for AI and hyperscale capacity.

Tera Data Centers (Malaysia) Sdn Bhd has agreed to acquire two parcels totalling 221.665 acres in Mukim Jimah, Negeri Sembilan, for approximately RM1.013 billion. The land is earmarked for data center development serving artificial intelligence and hyperscale computing.

The parcels sit within Eco Business Park 7, the first industrial development launched inside Parcel C of the Malaysia Vision Valley 2.0 masterplan, giving the campus an established industrial setting with power and road access already in place.

Read the full story on the Newsroom page

Ready to talk capacity?

Tell us your load profile and timeline — we'll map it to a site.

Contact us